⚡ SideGuy
📤 Share
Get Help →
✓ Link copied!
⚡ Decision Packet — EV
Level 1 or Level 2 Charger?
Level 1 takes 3 days to fully charge. Level 2 takes 8 hours. The answer depends on one number.
Decision Packet — EV
✓ Signal
The Daily Miles Test
Under 40 miles/day: Level 1 (120V plug) is sufficient. Over 40 miles: Level 2 is non-negotiable.
✓ Signal
Install Cost Reality
Level 2 install in SD: $600–$1,400 depending on panel distance and permit. Budget $1k.
✓ Signal
Panel Check First
Level 2 needs a 240V, 40–50A circuit. If your panel is at capacity: upgrade first.
✓ Signal
Utility Rebate
SDG&E offers EV charger rebates up to $500. Enroll before installation, not after.
🔁 The Loop
EV confusion → charger clarity → fast install
Not sure which way to go?
Text PJ — clarity before cost. Real answer in under 2 minutes.
Check your panel first — Text PJ →
📎 More Decision Packets
❄️ HVAC
☀️ Solar
⚡ Electrical
🏠 Roofing
🔧 Plumbing
All Shareables →
💬
SideGuy Solutions
Text PJ
773-544-1231 · Fast answers